Cold rooms and freezers put floors under thermal stress, condensation and constant trolley traffic. The system and installation timing have to suit low temperatures and the downtime available.

01Applications
02Specification
03Process
We check the concrete, moisture, cracks, joints and existing coatings, and confirm how the floor will be used.
Diamond grinding or mechanical preparation, then crack, joint and defect repairs. Most coating failures start here.
Primer, body and top coats for the specified system, with coving, line marking or colour zones built in.
Correct cure time before traffic returns, plus care and cleaning guidance.
05FAQ
Most systems need specific temperature conditions to cure. We confirm what's achievable for your room during the site inspection.
Yes. Coving can be included to make cleaning easier.
→Next step
Send us the floor area, location and current condition. Photos or plans help us quote accurately.